Projects

Mission Critical

Lift Destination control

Retrofit of destination control to 24 lifts within corporate end users global headquarters building

The works comprised the retrofit of PORT technology destination control to 24 existing lifts operating in 3 zones (low mid and high rise) within an existing global headquarters building occupied by a corporate end user to enable them to maintain to increase occupancy levels.  Works also included the mechanical upgrade works to increase the speed of the lifts, along with the replacement of hand landing locks, door contacts, door wire aircords, door shoes, left and right hand skates, door & pinch rollers.

Services

  • Cost Management
  • Quantity Surveying